Before cutting anything, build a cost sheet so you know where each rupee goes. Then work through the list below, starting with the items that are largest in your cost sheet.
Material and wastage
1. Measure wastage by reason, not as one number
Record rejection and scrap by product, machine and reason (setting, raw material, operator, handling). A single "wastage %" hides where it comes from. Most plants find two or three reasons cause the majority of loss.
2. Fix incoming material quality at the gate
Inspect a sample of every inward lot against a written specification. Rejecting bad material at the gate is cheaper than discovering it mid-production.
3. Standardise material consumption
Set a standard consumption per unit (bill of materials) and compare actual issues from the store each week. Gaps show leakage, theft or process problems.
Machines and time
4. Cut changeover time
Time every changeover, list the steps, and move whatever can be prepared in advance (dies, tools, material) to before the machine stops. Shorter changeovers mean more output from the same machines.
5. Move from breakdown to preventive maintenance
A written preventive maintenance schedule with a logbook reduces unplanned stoppages, which cost both output and overtime.
6. Plan production a day ahead
Daily planning against orders, capacity and material avoids idle machines and rush jobs. See production planning for small factories.
Energy
7. Measure power per unit of output
Install sub-meters on major machines or sections. Track kWh per unit weekly. Idle running, compressed-air leaks and poor power factor are common, fixable losses.
8. Review the electricity tariff and contract demand
Check your sanctioned load, maximum demand charges and power factor penalties on the bill with your electrician or an energy auditor.
Inventory and purchasing
9. Reduce excess inventory
Stock that sits for months ties up cash and gets damaged or obsolete. Set minimum and maximum levels for each item based on consumption and supplier lead time.
10. Consolidate and negotiate purchases
Group purchases of common items, compare at least three quotes for major materials and agree annual rates with escalation clauses for volatile inputs.
People and overheads
11. Link incentives to output and quality
Fixed wages with overtime reward slow work. An incentive linked to good output, not total output, rewards productivity and quality together. See KRA and KPI examples.
12. Review overheads line by line every quarter
Subscriptions, vehicle running, phone bills, courier, travel and consumables grow quietly. A quarterly line-by-line review usually finds savings.
How to run a cost reduction drive
| Week | Action |
|---|---|
| 1 to 2 | Build or update the cost sheet; rank cost elements by size |
| 3 to 4 | Start measuring wastage by reason, power per unit, changeover time |
| 5 to 8 | Pick the top 3 losses; assign an owner and target for each |
| 9 to 12 | Review weekly; lock improvements into SOPs |
Every saving should be written into an SOP, or it will slowly return.
TBS runs structured cost reduction and leakage analysis for manufacturers. See cost reduction consulting or production consulting.
Want this built for your business?
TBS installs these systems inside MSMEs and stays until your team runs them without you. Start with a 45-minute strategy session with the founder, or take the 20-minute Business Depth Assessment to see where you stand.
Frequently asked questions
What is the fastest way to reduce manufacturing cost?
Measure wastage and rejection by reason, then fix the top two or three causes. This usually delivers savings within weeks without capital investment.
Does cost reduction mean reducing quality?
No. The largest savings in most plants come from removing waste such as rejection, idle time, excess inventory and unmeasured power use, which often improves quality at the same time.
How do I know which cost to reduce first?
Build a cost sheet per product, rank the cost elements by size, and start with the largest element where you have the most control.
